They call me Brett turning neutrinos into bytes

Topic: fdvd

All talks

2026

  • Getting WC/LS ready for FDVD dune
    Status of getting Wire-Cell and LArSoft ready for the DUNE far detector vertical drift module (FDVD), with the FDVD configuration updated from ProtoDUNE vertical drift (PDVD) parameters for electronics response, noise spectra, field response and ADC setting. Presents a summary report generator for a 320-job multi-sim configuration and a new multi-sim mode that partitions art::Event products per Wire-Cell anode. Also covers the goal of making sure Wire-Cell and LArSoft use the same wires and channels.