Getting WC/LS ready for FDVDdune Status of getting Wire-Cell and LArSoft ready for the DUNE far detector vertical drift module (FDVD), with the FDVD configuration updated from ProtoDUNE vertical drift (PDVD) parameters for electronics response, noise spectra, field response and ADC setting. Presents a summary report generator for a 320-job multi-sim configuration and a new multi-sim mode that partitions art::Event products per Wire-Cell anode. Also covers the goal of making sure Wire-Cell and LArSoft use the same wires and channels.fdvd wire-cell larsoft vertical drift simulation field response noise spectra multi-sim