They call me Brett turning neutrinos into bytes

Depos for 4 tracks

· Brett Viren

Works through how four simulated Geant4 depositions, placed 10 cm in front of the collection plane, map onto the Wire-Cell ductor readout ticks, including the earliest and latest times that influence readout and the constant drift velocity assumption. Shows the resulting signals for the full readout and for each track.

Slides (PDF, 6 pages)

Group
uboone
Topic
readout-tick-timing
Keywords
readout ticks, depositions, geant4, drift, Wire-Cell, signal, timing, MicroBooNE