\title[Computing]{WCD Computing Update}
\date[100130]{Water Cherenkov Detector II, 2010/01/30}

\newcommand{\fixme}[1]{\textbf{FIXME:} \textit{#1}}


\begin{document}
\lstset{%
  emphstyle=\color{red},
  keywordstyle=\color{black}\bfseries,
  basicstyle=\footnotesize,
  identifierstyle=\color{DarkOrchid}\ttfamily,
  commentstyle=\color{Brown}\ttfamily,
  stringstyle=\color{blue}\ttfamily,
  showstringspaces=false}

\begin{frame}
  \titlepage
\end{frame}
\begin{frame}
  \frametitle{Outline}
  \tableofcontents    
\end{frame}

\section{Overview}


\begin{frame} \frametitle{Milestones}
  \begin{center}
    \begin{tabular}{lc}
      WBS Dictionary & done \\
      Preliminary requirements, initial draft &  done \\
      Preliminary requirements, due & 2/15 \\
      Draft Conceptual Design & 4/15 \\
      Baseline Conceptual Design & 5/15 \\
      Assessment of design alternatives & 5/15 \\
      Cost Estimate for CD-1 & 6/1 \\
      Contingency analysis for CD-1 & 8/1 \\
    \end{tabular}
  \end{center}
\end{frame}

\begin{frame} \frametitle{Internal Review}
  \begin{itemize}
  \item Latter part of February
  \item 3-4 hours, connect via EVO
  \item Chair: Jon Urheim
  \item Doesn't include simulation (reviewed separately Jan 14)
  \end{itemize}
\end{frame}

% prelim. req. doc.  Details below
% upcoming review organization
% other milestones

\begin{frame}[fragile] \frametitle{Organization}
  \vspace{-5mm} \includegraphics[height=\textheight]{org2}
\end{frame}

\section{Online Report}
\begin{frame} \frametitle{Online Report}
  \begin{center}
    $\longrightarrow$ Greg
  \end{center}
\end{frame}

\section{Offline Report}
\begin{frame} \frametitle{Offline Status}
  Simulation:
  \begin{itemize}
  \item Just heard from Simulation group
  \item Manual install of WCSim + GENIE on RACF (B. Bhuyan).
  \item Automated installer developed (see below)
  \end{itemize}
\end{frame}


\section{Infrastructure Report}

\begin{frame} \frametitle{Existing Computation Resources}
  BNL RHIC/ATLAS Computing Facility (RACF)
  \begin{itemize}
  \item Scientific Linux 5.3, 64bits
  \item 10 nodes $\times$ (16 cores, 5.5 TB storage, 24 GB RAM) / node
  \item Parasitic running on $\sim$2000 similar nodes.
  \item Work in progress: Xrootd to access storage on all RACF nodes
  \end{itemize}
  FNAL:
  \begin{itemize}
  \item ...
  \end{itemize}
\end{frame}

\begin{frame} \frametitle{Software Framework Status}
  \begin{itemize}
  \item Gaudi selected as default, IceTray retained as alternative
  \item Gaudi And Related Projects Installer (GARPI) (bv)
    \begin{itemize}
    \item CMT-based installation automation for non-CERN experiments
    \item Developed and in testing.
    \end{itemize}
  \item GARPI based WCSim+Geant4+ROOT installer working
  \item Software for Long-baseline and Under Ground (SLUG) (bv)
    \begin{itemize}
    \item In early development
    \item To become basis for our eventual software stack.
    \item Gaudi/GiGa/DetDesc based project.
    \item Initial geometry system in testing.  Python driven and flexible.
    \item Implementation of SK geometry in development.
    \item Also, has GARPI based installation.
    \end{itemize}
  \end{itemize}
\end{frame}

\begin{frame} \frametitle{Hardware and Networking Status}
  Computing Hardware:
  \begin{itemize}
  \item Initial CPU and storage requirements estimated (DocDB \#506 and requirements doc in prep)
    \begin{itemize}
    \item $635 + 94\times N_{year}$ CPU-year needed for year $N_{year}$ of running.
    \item $60 + 90\times N_{year}$ TB archived and live storage
    \item Currently LBNE has 160 CPUs and 55 TB disk in RACF, will double this in a year or so.
    \end{itemize}
  \end{itemize}
  Networking:
  \begin{itemize}
  \item In talks with BNL's network guru John Bigrow 
    \begin{itemize}
    \item Has determined ESNET is already at Homestake.
    \item Will try to set up ongoing connectivity monitoring to test reliability
    \end{itemize}
  \end{itemize}
\end{frame}

\begin{frame} \frametitle{DOEGrids Virtual Organization Discussion}
  \begin{itemize}
  \item Want to exploit Grid resources and/or ATLAS PANDA batch system.
  \item Job submission requires a grid certificate that is a member of a Virtual Organization (VO).
  \item We should register an LBNE VO
    \begin{itemize}
    \item Requires management and VOMS server
    \item BNL can handle this, but does FNAL want to do it?
    \end{itemize}
  \item Certs useful for other things: web authentication, email signing/encrypting.
  \end{itemize}
\end{frame}


% RACF computing now and FY11 budget
%% disk, cpu, xrootd, PANDA
%% prelim requirements for CPU and storage
% FNAL involvement (T.Junk)
% LBNE VO discussion
% Networking - John Bigrow, ESNET at Homestake
%% prelim requirements for bandwidth and reliability