<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>drift on They call me Brett</title>
		<link>https://www.phy.bnl.gov/~bviren/tags/drift/</link>
		<description>Recent content in drift on They call me Brett</description>
		<generator>Hugo</generator>
		<language>en-US</language>
		
		
		
		
			<lastBuildDate>Wed, 25 Nov 2026 19:22:42 -0500</lastBuildDate>
		
			<atom:link href="https://www.phy.bnl.gov/~bviren/tags/drift/index.xml" rel="self" type="application/rss+xml" />
			<item>
				<title>Depos for 4 tracks</title>
				<link>https://www.phy.bnl.gov/~bviren/talks/uboone/2018/09/07/readout-tick-timing/</link>
				<pubDate>Fri, 07 Sep 2018 00:00:00 +0000</pubDate>
				<guid>https://www.phy.bnl.gov/~bviren/talks/uboone/2018/09/07/readout-tick-timing/</guid>
				<description>Works through how four simulated Geant4 depositions, placed 10 cm in front of the collection plane, map onto the Wire-Cell ductor readout ticks, including the earliest and latest times that influence readout and the constant drift velocity assumption. Shows the resulting signals for the full readout and for each track.</description>
			</item>
	</channel>
</rss>
