<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>compression on They call me Brett</title>
		<link>https://www.phy.bnl.gov/~bviren/tags/compression/</link>
		<description>Recent content in compression on They call me Brett</description>
		<generator>Hugo</generator>
		<language>en-US</language>
		
		
		
		
			<lastBuildDate>Wed, 25 Nov 2026 19:22:42 -0500</lastBuildDate>
		
			<atom:link href="https://www.phy.bnl.gov/~bviren/tags/compression/index.xml" rel="self" type="application/rss+xml" />
			<item>
				<title>HDF5 I/O Enhancements for Wire-Cell Toolkit</title>
				<link>https://www.phy.bnl.gov/~bviren/talks/wire-cell/2026/02/05/hio/</link>
				<pubDate>Thu, 05 Feb 2026 00:00:00 +0000</pubDate>
				<guid>https://www.phy.bnl.gov/~bviren/talks/wire-cell/2026/02/05/hio/</guid>
				<description>Reports three HDF5 I/O enhancements to the Wire-Cell Toolkit HIO package: gzip compression and automatic chunking of datasets, a configurable HioTensorSink component, and HDF5 links for meaningful data paths. It describes the chunk-size algorithm, the tests that cover it, and a factory registration problem met along the way. The work was done in an LLM-assisted development session.</description>
			</item>
			<item>
				<title>Data Reduction for protoDUNE/SP TPC</title>
				<link>https://www.phy.bnl.gov/~bviren/talks/dune/2017/05/17/data-reduction-sc/</link>
				<pubDate>Wed, 17 May 2017 00:00:00 +0000</pubDate>
				<guid>https://www.phy.bnl.gov/~bviren/talks/dune/2017/05/17/data-reduction-sc/</guid>
				<description>Brett Viren outlines a data reduction concept for protoDUNE/SP TPC data, where the read, ADC, noise and signal steps are followed by rebinning, redigitizing and compression. He gives reduction options from DocDB 2089 and a pictorial comparison of the nominal and reduced pipelines. The talk then covers a strawman proposal, computing requirements and processing latency.</description>
			</item>
			<item>
				<title>ProtoDUNE/SP Data Reduction</title>
				<link>https://www.phy.bnl.gov/~bviren/talks/dune/2017/02/22/data-reduction-software/</link>
				<pubDate>Wed, 22 Feb 2017 00:00:00 +0000</pubDate>
				<guid>https://www.phy.bnl.gov/~bviren/talks/dune/2017/02/22/data-reduction-software/</guid>
				<description>Brett Viren reviews the protoDUNE/SP data reduction chain of ADC mitigation, noise filtering and signal processing, followed by removing oversampling and packing. He reports about 4x compression at MicroBooNE-like noise, 6-8x at expected noise, 150x from ROI selection alone and 400x with rebin-3. He also describes validation with a new Wire Cell simulation.</description>
			</item>
			<item>
				<title>Data Reduction Effort at BNL</title>
				<link>https://www.phy.bnl.gov/~bviren/talks/dune/2017/02/06/local-data-reduction/</link>
				<pubDate>Mon, 06 Feb 2017 00:00:00 +0000</pubDate>
				<guid>https://www.phy.bnl.gov/~bviren/talks/dune/2017/02/06/local-data-reduction/</guid>
				<description>Brett Viren describes a BNL data reduction job made of unpacking, ADC mitigation, noise filtering, signal processing, rebinning and packing steps, with the reduction factor estimated after each step. He reviews the contexts where the reduction code would run, including online monitoring, prompt processing and offline production. He also compares the LArSoft and Wire Cell Toolkit work split.</description>
			</item>
			<item>
				<title>Data Reduction Proposal and Computing Requirements</title>
				<link>https://www.phy.bnl.gov/~bviren/talks/dune/2017/01/24/reduccomp/</link>
				<pubDate>Tue, 24 Jan 2017 00:00:00 +0000</pubDate>
				<guid>https://www.phy.bnl.gov/~bviren/talks/dune/2017/01/24/reduccomp/</guid>
				<description>Brett Viren proposes an initial data reduction step run soon after raw protoDUNE data is saved, keeping the full raw data on tape. He evaluates rebinning, truncation, packing and ROOT compression options against reduction factor and compression time. He also estimates CPU and RAM needs, arriving at roughly 3000 cores with 2 GB RAM each during running, and lists further opportunities.</description>
			</item>
			<item>
				<title>Two Important Issues for DUNE Data Rate Estimations</title>
				<link>https://www.phy.bnl.gov/~bviren/talks/dune/2015/05/08/data-rate-estimation/</link>
				<pubDate>Fri, 08 May 2015 00:00:00 +0000</pubDate>
				<guid>https://www.phy.bnl.gov/~bviren/talks/dune/2015/05/08/data-rate-estimation/</guid>
				<description>Four slides by Brett Viren for the DUNE collaboration phone conference on two issues in data-rate estimation. The first is the 39Ar event size and rate, where the total is 53 PB/year without zero suppression and raising the threshold to 0.6 MeV is proposed as a question. The second is the size of GeV-scale events, which drops from about 10 MB to 2.5 MB by removing redundant fields and to about 0.1 MB with compression.</description>
			</item>
	</channel>
</rss>
