PV is the most reliable part in the pnn analysis:
the rejection/acceptance are measured with real data (Kpi2/Kmu2 samples, respectively).
Calibration
CCD linearity constants ($CAL_DB/ccd_lin.xxxxx) will be installed to CFM (JM).
<--- ccd_lin.00124[runs 46181-46314], 00126[runs 46315-48780], 00127[runs 48781-60000] were installed to $CAL_DB on Jun 20.
BV/BVL calibration
- TK will send an Email to Jim Frank, and TY will master the skills of calbration at BNL from Jim.
EC calibration
- TS has already made the 1st round of calibration during the run.
- TK and TY do the next round of calibration after the CCD linearity constants are installed.
CO/MC/DPV calibration
- Valery Anisimovsky et al are making a technote on "Study of collar counters". We encourage them to continue the study.
RSmon ntuples, containing the BV and BVL gains by LED, will be used for the gain calibration.
checks
start "timing vs run" study with the autorun ntuples (TY,TK)
TD/TDC/CCD strobes
trktim - Dstrobe
timing - trktim
online PV rejection vs run/intensity (TK)
offline PV code
pass2_monitor_PV.F: storing the Timing and Energy of the hits into ntuple-variables
pvcut.F: judgement of PV
- to EACH sub-category (upto 20),
input parameters: time window, energy threshold
veto if the sum of the visible energy of the hits whose timing is within the time window
exceeds the energy threshold.
This routine works in Fortran as well as in FORPAW.
$KOFIA_USER/intime.F is a standalone PV routine, easy to be used by non-experts.
- After discussions, we decided to stop the maintenance of the KOFIA routine
because it was unused in the E787-II analysis.
- Instead, "easy-to-use" PV code plus standard PV parameters will be put to KOFIA (JM).
code development (JM)
add new/modified subsystems (BVL, CO, DPV) to the PV code.
BM counter hits (B4,AD,UPV, ...) will be stored to the ntuplpes and be used for PV as well.
We store TD hits as well as TDC hits in RS and BVL for missing TDC hits
and for finding electrons in the pi->mu->e chain.
We decided NOT to use the RS-Intime cut, which had been imposed at the E787-PASS1, in the E949 production.
ideas of upgrading the PV algorithm (suggested by JM)
"clustering' of the hits in BV, BVL, ... for PV to avoid veto due to accidental single hits
See the event display in this slide;
the Kmu2 event is vetoed if the energy sum of the two hits in BV exceeds the PV energy threshold,
but they look like separate accidental hits rather than the shower due to a photon.
The clustering codes by E787 exist.
energy-dependent time window
See this slide;
it is well known that the timing resolution in a calorimeter is energy dependent and gets smaller for larger energy,
while the time window in the current pvcut.F is fixed for all the energy.
We can make the time window narrower for the hits with larger energy.
This PV scheme was studied in E787 by Norihito Muramatsu and he obtained no gain due to it,
which is presumably because
the acceptance loss due to accidental hits gets smaller for larger energy.
Toshio Numao pointed out that he also tested this scheme in E787 pnn2 analysis and did not take it,
because he was afraid of missing large visible-energy hits by narrowing the time window.
The priority of these studies are not high;
at some time we check Rejection and Acceptance with a new algorithm and see whether we achieve improvements due to it.