E907 Information for the Collaboration
For your information, we have the
- Run Log for the 1996 Engineering Run in
- Calibration Data listed separately in
Tabular and
Postscript formats.
- Scintillator Stack Data listed separately in
Tabular and
Postscript formats.
- Chamber Stack Data listed separately in
Tabular and
Postscript formats.
New pieces of analysis code:
- A new version of
astart.flx to go with the new version of
read_maps.flx . This version of read_maps picks out the
correct geometry for the NMS position from the file
matrix_all.dat based on the run number.
- The updated version of
cath_c69.flx, the demultiplexing code for the NMS chambers.
New gain files and detector maps:
- A new set of
CsI gains. These are the result of a simple alignment of
the monoenergetic photon peak on a crystal by crstal basis. They
represent a considerable improvement over the cosmic calibration.
- A new set of
BGO gains. These were a quick fix before the Boston meeting
and will hopefully be updated soon.
- A new set of
cathode gains for the chamber stack.
- The new
cathode map for the NMS chambers.
Mass and Energy Spectra From Runs 162 - 166
K+ beam stopping in the scintillator stack.
Mass and Energy Spectra From Run 319 (January 7, 1997) [PRELIMINARY]
Run 319 was a K- beam stopping in the chamber stack.
Various gif files of detector elements.
Postscript or Encapsulated Postscript version of these are available.
James A. Gerald: gerald@bnl.gov