From: BNLDAG::JIA 3-MAY-1996 12:21:27.89 To: BUNCE,MORSE CC: PILE,JIA Subj: Refrigerator is running The g-2 Cryogenic News 5/3/96 Lin Jia The g-2 Refrigerator with the newly modified liquid nitrogen heat exchanger began to run at 10:00 AM this morrning. The running system includes the helium gas supply system, two compresors, refrigerator cold box, liquid nitrogen heat exchanger, control dewar. The three solenoid cryostats are isolated out from cooling. The current plan is to run the system through the weekend around the clock, because the vacuum in three cryostats is going to be spoiled by Monday morning for repairing the leaks in cryostats. Since there is not going to have the beam test tonight for the g-2, the cryo-watches will not be locked out by the security doors in the g-2 cryo area.