Cabling plans

The plan shown below does not attempt to include any triggering or any signals which are not directly produced from the signals arriving in the control room from the detectors. Please give any corrections to this plan as soon as it is convenient as some such plan is neccessary in order to form a cabling/labelling scheme for the racks.
There is a listing of the various sub-units of this drawing. These will facilitate the printing out and viewing of the drawing in detail.

If you would like to look in detail at any of the sub elements of the drawing below, click on the purple words to see a close up.

Here is a the layout of the detector signal cabling

to look at the postscript for this plan click here Postscript version of the picture


  • Drawing of the CALORIMETER sub unit of the drawing.
  • Drawing of the FSD sub unit of the drawing.
  • Drawing of the PSD sub unit of the drawing.
  • Drawing of the QVM sub unit of the drawing.
  • Drawing of the REFERENCE TUBE sub unit of the drawing.
  • Drawing of the FIBRE HARP sub unit of the drawing.
  • Drawing of the T0 COUNTER sub unit of the drawing.
  • Drawing of the LED sub unit of the drawing.
  • Drawing of the SLOW CONTROL sub unit of the drawing.