special runs at the end of the beam 2002 ======================================== Last update Fri Jun 7 16:49:48 EDT 2002 committee: David Jaffe djaffe@bnl.gov Takeshi K. Komatsubara koma@bnl.gov //////////////////////////////// /// BEFORE the beam goes off /// //////////////////////////////// o Regular detector-calibration runs with beam ON - km21_mix with cs1_v7.cfg, 100k events (TT, once in a month) DONE: runs run 50150 & 50151 with 42791 & 56970 events, respectively ==== - eckmu2_mix with cs1_noCCD_v7.cfg, 400k events (ECgain, once in a month) All eckmu2_mix data should be taken in a very short period of time! [last cal. 15 may, next calibration to be done 7 June] DONE: runs 40152-156, ~368K \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ \\\ AFTER the beam goes off \\\ \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ o Detector-calibration runs with beam OFF - cosmic ray with B=0 (requested by Toshio, Shaomin for UTC geometry study) 250k events with the new electronics. runs 50097-9, 50112-3, 40139 ~63K events already taken before 8 June. runs 50222-50231 ~184K events for total of ~247K - Collar/MicroCollar/DPV gain study with cosmics ~2 hours of data-taking Tetsuro must set up trigger (eckmu2 with KBeam requirement removed). - CCD linearity measurements (before the electronics is turned off) DONE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX SHUTDOWN Schedule XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Please confirm the beam schedule from http://www.agsrhichome.bnl.gov/AP/RHIC2001/SchedPhys/. - Jun 9(Sun) 24:00 E949 and SEB end - Beamline magnets (including D3) off immediately after that. Begin cosmic data-taking. - Turn off HV and electronics after taking beam off data (should be on June 11(Tues) afternoon) - June 12 (Wed) Toshio plans to turn off the UTC and RSSC gases. this file is /wwwdocs/e949/run/0206_beamend.txt owned by e949 ============================================ End of this document