| Target | Dates | Material | width | height | length | segments | Comments |
|---|---|---|---|---|---|---|---|
| (inches) | (inches) | (cm) | |||||
| T-95 | 5/12/92-6/5/95 | Pt | 0.2 | 0.4-0.15 | 6 | 3 | TC in base |
| T-107 | 6/5/95-3/1/96 | Pt | 0.2 | 0.4-0.15 | 6 | 1 | cracks |
| T-109 | 3/1-26/96 | Pt | 0.2 | 0.15 | 6 | 5 | EB Weld |
| T-111 | 3/26-29/96 | Cu | 0.2 | 0.15 | 8.9 | 5 | no good |
| T-95 | 3/29/96-5/30/96 | Pt | 0.2 | 0.4-0.15 | 6 | 3 | TC in base |
| T-112 | 5/30/96-8/22/01 | Pt | 0.2 | 0.2-0.05 | 6 | 6 | T-112 Picture , Pictures upon removal after 1998 run |
| T-120 | 9/5-8/98 | Pt | 0.2 | 0.2-0.05 | 8.9 | 9 | no good |
| T-121 | 8/22/01-present | Pt | 0.2 | 0.15-0.025 | 6 | 8 | 4 TC, T-121 Picture , Sketch , Flag drawing , Flag picture , Target+mount picture , iter#1 Photo after 2002 run |
| Home | E949 Detector | Tracking | Beam | Photon Veto | Electronics | Monitoring System | Papers | Presentations | Technotes |